This is the infrastructure where the LNG is loaded into special vehicles that transport it to markets not served by natural gas pipelines.
The Truck Loading Station (ECC) comprises four independent bays where the LNG is loaded into tanker trucks specially designed for its transport. They serve cities and industries not connected to the main gas pipeline network.
The ECC has the capacity to load 2,500 cubic meters of LNG per day (around 50 trucks), equivalent to 1.5 million cubic meters of natural gas per day. Its operation is managed from a special control room that is interconnected with the main Control Room.